Soft-Story Seismic Retrofit – City of West Hollywood

The City of West Hollywood officially implemented a seismic retrofit program on April 17, 2017. This program was created to reduce earthquake-related risks and improve life safety for occupants of commercial and multifamily buildings throughout the city. Ordinance 17-1004 outlines the mandatory requirements for strengthening existing wood-frame buildings that have soft, weak, or open-front walls. It also includes requirements related to cripple walls and sill plate anchorage in older wood-frame structures. The ordinance went into effect on April 1, 2018.

  • Priority I: Buildings with 16 or more dwelling units
  • Priority II: Buildings with 3 or more stories and fewer than 16 dwelling units
  • Priority III: Buildings that do not fall under Priority I or Priority II

Milestone

Begin Process

Notice of the program is served to the building owner

1 Year After Notice

Deadline to submit the screening report

2 Years After Notice

Deadline to submit retrofit plans

4 Years After Notice

Deadline to obtain permits and begin construction

5 Years After Notice

Deadline to complete the retrofit construction

What Medro Engineering Provides

  • Full structural assessment
  • Identification of SWOF lines
  • Determination of “Retrofit Required” or “Exempt”
  • Engineering justification for exemption requests
  • Posting guidance for required signage

Fully compliant with Burbank Seismic Design Guidelines, including: 

  • Lateral analysis and calculations 
    Soft/weak/open-front wall strengthening design
  • Diaphragm, collector, and foundation upgrades
  • Cantilever column systems
  • Drift checks, base-shear calculations, and irregularity assessments
  • Complete structural details and material specifications 
  • Plan check response letters
  • Structural observation forms
  • Coordination with Building & Safety 
  • Housing and tenant-notification support 
  • Structural observation during key stages
  • Contractor RFI support
  • Final approval assistance 
  • 100% permit-fee refund for full compliance by July 10, 2026
  • 50% refund for compliance by January 10, 2028
  • Mandatory safety signage after Notice to Comply
  • Posting of construction notices
  • Removal of signage after final City approval 

Owners may recover up to 50% of construction costs (max $51/unit/month for up to 120 months).